Funding opportunities for high-temperature heat pumps in process heat generation

The generation of process heat accounts for just over 20 percent of Germany’s total final energy consumption. Because process heat is still predominantly generated from fossil fuels – usually natural gas – it is not only one of the largest sources of CO₂, but also an increasing cost driver. Rising CO₂ prices, volatile fuel markets, and growing regulatory pressure are likely to further intensify the situation going forward.

 

Industrial companies in Germany and Europe face a dual challenge. Companies must comply with climate targets and regulatory requirements while reducing costs to remain internationally competitive. high-temperature heat pumps offer a highly effective lever for this challenge: They use waste heat from existing industrial processes to generate process heat and process steam efficiently, reliably and with a significantly smaller CO₂ footprint. 

 

What Funding programs support high-temperature heat pumps in Germany? 

 

Germany offers several funding programs and grants for industrial use of high-temperature heat pumps. These differ by funding provider, whether federal, state or municipal, and by funding object, whether investment support or operating cost support. The following sections present the most relevant funding opportunities, including funding rates and maximum funding amounts. EEW funding can also be provided as a low-interest loan with a repayment grant via KfW.

 

Program Funding Rate Maximum Amount Deadlines Special features
EEW Module 4 Premium 25-45 % up to 20 million € ongoing Bonus + 10 % for decarbonization
EEW Module 5 transformation plan 40-60 % up to 90.000 € ongoing Mandatory for climate neutrality strategy
EEW funding competition up to 60 % up to 20 million € Rounds: Nov-Dec 2025 Ranking based on funding efficiency
Hamburg OPEX OPEX difference 5-year grant ongoing Operating cost funding for heat pumps
KfW-Programs low-interest loans + grant customized ongoing Combinable with EEW, liquidity support

 

 

EEW – Module 4 Premium Funding “Energy- and resource-related optimization of plants and processes” (BAFA) 

 

Module 4 Premium of the Federal Funding for Energy and Resource Efficiency in Industry advances the energy- and resource-related optimization of plants in a largely technology-neutral manner. Unlike the basic version of the scheme, the premium funding covers both changes to existing systems and the replacement of existing equipment, so Extensive, complex systems qualify. The program proves especially attractive when combined with heat pump systems for process heat generation. 

 

 

Funding objective 
 

  • Energy- and resource-related optimization of plants and processes 

 

Eligible measures 

 

  • Electrification of processes, including the installation of high-temperature heat pumps 
  • Measures for waste heat utilization, efficient heat and cold generation, process heat integration, thermal storage technologies 
  • Optimization of heating and cooling networks or conversion to renewable energy sources 

 

Prerequisites 

 

  • Submission of a savings concept developed through qualified energy consulting, using the mandatory BAFA-provided form  
  • Reduction of greenhouse gas (GHG) emissions by at least 30%, though absolute savings values may apply depending on company size 
  • Payback period of the project without funding of at least 3 years 

 

Funding rates 

 

  • Small enterprises: up to 45 % 
  • Medium-sized enterprises: up to 35 % 
  • Large enterprises: up to 25 % 

 

Absolute funding amounts 

 

  • Small enterprises: up to €1,600 per tonne CO₂ 
  • Medium-sized enterprises: up to €2,200 per tonne CO₂ 
  • Large enterprises: up to €2,600 per tonne CO₂ 
  • Maximum €20 million per project 

 

Particularities 

 

  • Up to 10 percentage points bonus for decarbonization, for example through electrifying processes with green electricityvia onsite power generation (such as PV) 
  •  or a Green power PPA. pure green electricity tariffs from a supplier are not permitted 
  • GWP must not exceed 150 unless the efficiency criteria from Module 2 are met 

 

 

EEW – Module 2 “Process heat from renewable energies” (BAFA) 

 

Module 2 of the Federal Funding for Energy and Resource Efficiency in Industry drives the electrification of process heat generation, though the module is heavily constrained by the requirement that the heat used must predominantly come from renewable sources. Heat pump systems that obtain 50% or more of their heat from waste heat are not eligible, so this module generally targets processes with supply temperatures below 90°C. 

 

Funding objective 

 

  • Decarbonization of industrial process heat 
  • Electrification of process heat generation through heat pumps that predominantly use renewable heat sources such as aerothermal, geothermal, hydrothermal or solar 

 

Eligible measures 

 

  • Installation of high-temperature heat pumps including necessary plant peripherals 
  • Development of heat sources 
  • Process heat storage 
  • Planning and concept development 

 

Prerequisites 

 

  • At least 50 % of the heat generated must be used as process heat 
  • The heat pump must predominantly use renewable energy sources 
  • The heat pump must have an effective coefficient of performance (COPeff) of at least 2.0 and an efficiency factor of at least 0.4 
  • Electricity or heat meters are required to provide real-world data from at least 3 years of operation 

 

Funding rates 

 

  • Small enterprises: 60 % 
  • Medium-sized enterprises: 50 % 
  • Large enterprises: 40 % 

 

Absolute funding amounts 

 

  • Maximum €20 million per project 

 

Particularities 

 

  • The electricity used must be fully from renewable energies, proven onsite power generation (such as PV 
  • ), a Green power PPA 
  •  or a Green electricity contract 
  • Electricity meters or heat meters are mandatory, and at least 3 years of data must be verifiable 

 

EEW – Energy and Resource Efficiency Funding Competition (VDI/VDE-IT) 

 

The Energy and Resource Efficiency Funding Competition is also part of the Federal Funding for Energy and Resource Efficiency in Industry (EEW) and targets companies implementing particularly energy- and greenhouse-gas-effective investment projects. Unlike the EEW modules above, funding here is allocated competitively: projects are funded when they achieve particularly high funding efficiency compared to other proposals. For industrial heat pumps used to generate process heat, the funding competition is likely one of the most interesting nationwide funding instruments available. 

 

Funding objective 

 

  • Increasing energy and resource efficiency in industry and commerce 
  • Reducing GHG emissions through investment measures 
  • Supporting projects with a particularly favorable ratio between funding requirement and savings impact 

 

Eligible measures 

 

  • Electrification of industrial processes, including: 
  • Industrial heat pumps for using waste heat 
  • High-temperature heat pumps for generating process heat or process steam 
  • Measures for waste heat utilization and treatment 
  • Process optimizations and efficiency measures 
  • Heat exchangers, storage, plant peripherals, measurement, control and regulation technology 
  • Project-related planning and ancillary costs directly attributable to the investment project 

 

Prerequisites 

 

  • Submission of a savings concept with a transparent calculation of energy and GHG savings 
  • The project must significantly reducte energy consumption or GHG emissions 
  • No start of measures before approval 
  • Energy- and resource-cost-based payback period of the project without funding of at least 4 years 

 

Funding rates 

 

  • Funding is provided as an investment grant 
  • The level of funding results from:
    • The amount of the requested grant
    • The proven savings impact 
    • The outcome of the competitive ranking 
  •  Maximum funding rate: 60 % 
  • First indicative benchmark at approximately €250-550 per tonne CO₂ 

 

Absolute funding amounts 

 

  • Maximum €20 million per project 

 

Particularities 

 

  • Competitive ranking system assesses projects based on funding efficiency such as funding required relative to savings impact and awards grants to the most efficient projects by comparison 
  • Several competition rounds per year 
  • The higher the CO₂ savings impact relative to investment costs, the better the chances in the competition 
  • No AGVO or de minimis restriction applies. Grants from this program are therefore not to be classified as state aid 

 

EEW Module 4 or funding competition: Which module fits a heat pump project? 

 

EEW – Module 4 

EEW – Energy and Resource Efficiency Funding Competition 

For clearly defined individual projects  

For large or long-term projects 

Waste heat as the main heat source fully permissible  

Suitable for particularly high CO₂ avoidance impact and full-load operation 

Suitable especially for moderate project sizes 

Higher grants possible 

Classic grant without competition 

Award dependent on competition 

 

Climate protection contracts, CO₂ difference contracts (BMWK) 

 

With the climate protection contracts, the Federal Ministry for Economic Affairs and Climate Action (BMWK) created a technology-neutral funding instrument that specifically targets large-scale industrial decarbonization projects. Unlike traditional investment grants, climate protection contracts compensate over a long period for the additional costs of climate-friendly technologies compared to fossil reference solutions, such as fluctuating CO₂ or energy prices. For industrial heat pumps that generate process heat or process steam from waste heat, climate protection contracts are particularly relevant when they are part of a comprehensive transformation project in energy-intensive industries. 

 

 

Funding objective 

 

  • Long-term decarbonization of energy-intensive industrial processes 
  • Securing investments in climate-friendly technologies against cost risks 
  • Rapid and continuous market ramp-up of key technologies to achieve climate targets by 2045 

 

Eligible measures 

 

  • Electrification of industrial process heat, including: 
  • High-temperature heat pumps, also based on waste heat 
  • Electric steam generation 
  • Conversion of fossil process heat generation to climate-friendly alternatives 
  • Other decarbonization technologies such as hydrogen applications or CO₂ capture and storage technologies (CCS/CCU), provided they are part of the overall project 

 

Prerequisites 

 

  • Large investment volume (minimum €15 million) 
  • Significant and permanently verifiable CO₂ reduction compared to a fossil reference. from the third funding year at least 60 % compared to the reference system 
  • Savings of at least 5,000 tonnes of CO₂ equivalents per calendar year 
  • Use of the technology in energy-intensive industrial processes 
  • Participation in a competitive auction procedure 
  • Long-term commitment to emission reductions over the contract term 
  • A GHG emission reduction of at least 90 % compared to the reference system must be technically possible and achieved in the final 12 months of the contract term 

 

Funding logic and amount 

 

  • No classic funding rate, Instead, a CO₂ difference premium compensates for the difference between the costs of the climate-friendly solution, such as industrial heat pump using waste heat, and the fossil reference 
  • Both investment and operating costs can be taken into account 
  • Contract term of up to 15 years 
  • Funding volume to date between €100 and 500 million per project 
  • Total budget: several billion euros until 2030 

 

Particularities 

 

  • Particularly relevant for large companies and energy-intensive sectors such as chemicals, steel, glass, paper and basic materials  
  • Waste-heat-based industrial heat pumps are in principle eligible, provided they are integral to a comprehensive decarbonization concept 
  • Comparatively high effort for application, economic and emissions documentation 
  • Not a replacement for classic EEW grants, but a complementary instrument for very large transformation projects 

 

Notes 

 

As a prerequisite for participation in climate protection contracts, the fossil reference system must have, or would have, annual GHG emissions of at least 5,000 tonnes of CO₂ equivalents. By contrast, a fixed minimum amount of emissions to be saved is not defined. Selection happens through an auction based on the costs per avoided tonne of CO₂ bid by the company, so projects with larger absolute emissions reductions often have better chances in practice. 

 